EasyManua.ls Logo

Growatt SPH Series - Fault Mode Handling; Programming Mode; Checking Mode; Standby Mode

Growatt SPH Series
66 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Drill four Ф8 holes at the mark point, the depth is not less than 55mm.
5. Knock four explosion bolt into Ф8 holes (As the chart 5.8b below).
6. Hang the energy storage machine on the four setscrews (As the chart 5.8c below).
7. Lock the nut of setscrew (As the chart 5.8d below).
8. The whole installation has finished.
a)
b) c)
d)
Chart 5.8

Other manuals for Growatt SPH Series

Related product manuals