Chapter 5: Getting Started
The dump chutes should be fully open.
8. Inspect the dump chutes, and if they are not fully open, loosen the double nuts on the hinge bolts.
9. Re-install all guarding and enclosures.
10.Set the Dump switch on the TopDry Terminal to the Auto position and press the Stop button.
The dump chutes should raise to the closed position.
Figure 5-1 Chute controller limit switch positions
A
Chute position controller electrical box
E Bolt
B Damper switch F
Chain
C Sprocket G Open position
D Limit switch H
Closed position
Testing the Fill System
You must test the fill system that will deliver the wet grain to the TopDry is operating properly prior to
drying grain.
Before You Begin
Make sure you have completed the pre-season inspections.
E-Stops are pulled out.
Power has been supplied to the system.
Pneg–4900 TopDry Terminal™ 53

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GSi TopDry Terminal 24 and is the answer not in the manual?

GSi TopDry Terminal 24 Specifications

General IconGeneral
BrandGSi
ModelTopDry Terminal 24
CategoryControl Panel
LanguageEnglish