www.gtec-power.de 23
5. Check the UPS.
(a) Visually examine if there are any damages to UPS during transportation. If any, contact
to the carrier.
(b) Check the UPS with the list of the goods. If any items are not included in the list, contact
our company or the local office.
6. Dismantle the bolt that connects the cabinet and wooden pallet after disassembly.
7. Move the cabinet to the installation position.
Attention
Be careful while removing to avoid scratching the equipment.
Attention
The waste materials of unpacking should be disposed to meet the demand for environmental protection.
2.3 Positioning
2.3.1 Positioning Cabinet
The UPS cabinet has two way of supporting itself: One is to support itself temporarily by the four
wheels at the bottom,making it convenient to adjust the position of the cabinet. The other is by
anchor bolts to support the cabinet permanently after adjusting the position of the cabinet. The
supporting structure is shown in Figure 2-5.
(a) 10-20kVA (Bottom, unit: mm)