3.0 - INSTALLATION
3.1 Permits
In all areas, a permit to install is required from the local Air Pollution Control
Authorities. The purchaser is required to obtain the necessary forms and complete the
application process.
Guspro Inc. will furnish technical support material for submittal with the application
forms (see Section 1.7). Guspro will also complete a technical inspection of the forms and
supply independent test report data upon request.
In some localities, building permits are required for installation of process equipment
such as the Guspro heat-cleaning oven. The purchaser is advised to contact their Building
Department for clarification.
3.2 Purchasers Requirements Prior to Installation
Prior to oven delivery, the purchaser will need to provide the following:
1. An adequately reinforced concrete pad for setting the Oven. The proposed location must
be checked for stack clearance from walls and stack height over the roof or adjacent
roofs.
2. Recommended stack clearances are listed in Table 3.1. Some of these values may vary
from region to region. It is the purchaser’s responsibility to confirm these requirements
with local authorities.
Table 3.1
Minimum Suggested Stack Clearances
Location
Position
Required
Height
Stack Extends
Over roof line
10 ft.
25 ft from any obstruction
10 ft.
Side & Back
Clearance to wall (non-combustible)
2 ft.
Front
Clearance
8 ft.
[1]
Top
Relief Lid (when fully opened)
Recommended Minimum
4 ft.
[1] Depending on oven model, adequate clearance should be maintained for safe loading and unloading of
parts.