2017_E_TYPE-HL.doc Page 20 of 55 24-Oct-2017
The water connection for the Over Temperature Suppression System (OTS) system is
typically on the right side of the oven at the inlet solenoid valve. The diameter of the connecting
pipe on the OTS system is 3/4". If the inlet water line is 1/2", a reducing fitting should be
connected to the OTS pipe.
The OTS nozzles are sized for 30-50 PSI pressure when operating. This may be verified
by depressing the OTS Test button after connection and reading the attached gauge. The
minimum water pressure is 20 PSI. If at any time the water pressure drops below the minimum
20 PSI the low water pressure switch located on the OTS valve block will shut down the process
burner.
If the observed operating pressure is over tagged value, the manual valve on the manifold
should be adjusted to ensure proper operating pressure.
If the observed operating pressure is under 30 PSI, the supply line should be checked for
restrictions. The water pressure required is supplied on a tag on the OTS valve block. This
should be noted at start-up.
3.6 Receiving
The Oven is shipped completely assembled and only requires stack installation and utility
connections. Due to shipping regulations, oxidizer chambers on larger units are often shipped
separately. An installation diagram is included with the oven.
Under the terms of the sale, shipment becomes the purchaser’s property when released by
Guspro to the carrier. While Guspro is not responsible for loss or damage in transit, Guspro will
assist in processing claims against the carrier when necessary.
It is the purchaser’s responsibility to make a thorough inspection of the shipment
immediately upon delivery.
If damage is found or if all the items listed on the bill of lading have not been received,
the local agent of the delivering carrier should be notified and requested to inspect the shipment.
Failure to give such notification could result in the carrier’s refusal to process a loss or damage
claim.
Any and all damage must be noted on delivery receipt. The name of the carrier’s
representative, and the date and time of contact, must be noted on the delivery receipt.
Should the carrier’s representative fail to make an inspection of the short or damaged
equipment after being notified, details of inspection by the consignee should be furnished