EasyManua.ls Logo

H3C MSR810 - Installation Accessories (RT-MSR810-LME;RT-MSR810-LMS;RT-MSR810-LMS-EA;RT-MSR810-LUS); Installation Tools; Pre-Installation Checklist

H3C MSR810
65 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
Installation accessories (RT-MSR810-LME/RT-MSR810-
LMS/RT-MSR810-LMS-EA/RT-MSR810-LUS)
Figure 2 Installation accessories
The RT-MSR810-LME, RT-MSR810-LMS, and RT-MSR810-LUS routers are not shipped with 4G
antennas.
Installation tools
No installation tools are provided with the router. Prepare them yourself as required.
Figure 3 Installation tools and equipment
Pre-installation checklist
Item Requirements Result
Installation
site
Ventilation
• There is a minimum clearance of 100 mm (3.94 in)
around the air inlet and outlet vents.
• An adequate ventilation system is available at the
installation site.
Temperature 0°C to 40°C (32°F to 104°F)
Relative
• 5% to 90% (noncondensing):
Ruler Wire-stripping pliers
Rubber hammer
Heat gun
Hammer drill Marker
Diagonal pliers
Flathead screwdriver Phillips screwdriver
ESD wrist strap

Table of Contents

Other manuals for H3C MSR810

Related product manuals