6
Installation tools
All installation tools are user supplied.
Flat-head screwdriver Phillips screwdriver Needle-nose pliers Diagonal pliers
ESD wrist strap Marker
Accessories
Mounting bracket
for the F1005 and
F1010
Mounting brackets (including M4
shoulder screw) for other F10X0
models than F1005 and F1010
M4 screw
M6 rack screw and cage nut
(shipped with the F1005
and F1010 firewalls and
user supplied for other
models)
Rubber feet Power cord retainer clip Power cord Grounding cable
Console cable
Pre-installation checklist
Table1-4 Checklist before installation
Installation
site
Ventilation
• Workbench mounting—Ensure a minimum
clearance of 100 mm (3.94 in) around the air inlet and
outlet vents of the chassis.
• 19-inch rack mounting—Ensure a minimum
clearance of 80 mm (3.15 in) around the air inlet and
outlet vents of the chassis and a distance of 1U
(44.45 mm, or 1.75 in) between the chassis and other
devices.
• A good ventilation system is available at the
installation site.