EasyManua.ls Logo

Hatz M Series - 7.3 Engine Start Preparation

Hatz M Series
104 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation and use 3-4L43C, 3-4M43, 3-4M43Z
34
HATZ
Manual
Step Test
6 No persons are located in the danger zone of the engine or ma-
chine.
7 All safety equipment is in place.
7.3 Start preparation
Procedure
Step Activity
1 Before the first start and with an empty fuel system:
Pump the fuel with the manual fuel pump (see chapter 7.3.1
Pumping fuel with the manual fuel pump, page 34)
7.3.1 Pumping fuel with the manual fuel pump
Requirements
Pre-pumping of fuel with the manual fuel pump is necessary in the following
situations:
Engine shuts down due to empty fuel tank
at first filling of the fuel tank
after changing the fuel filter
Overview
2
3
Pos. Designation
1 Bleed screw
2 Filter
3 Rubber ball

Table of Contents

Related product manuals