Model EEE-182
6-11
6-9. OIL CHANNEL
CLEAN-OUT
5. Follow probe installation instructions below:
Excess force will damage temperature probe. Hand-tighten
nut and then 1/2 turn with a wrench.
6. Connect new temperature probe to the 2 fryer connections.
7. Replace rear cover and reconnect power to vat.
8. Lower element back into vat and close drain. Fill vat
by pressing and holding button until *FILTER*
*MENU* shows in the display. Then once “1.EXPRESS
FILTER” shows in the display, press 4 times until
“5.FILL FROM PAN” shows in the display. Press √
button and “PUMP” “EXIT” shows in the display. Press √
buttonagain,andoilllsvat.Oncevatisfull,pressX
twice to return to normal operation.
Should the drain channel, under the vats, become clogged, ac-
cess to a clean-out plug is available by removing the right or left
side panels.
6-8. TEMPERATURE PROBE
REPLACEMENT
(Continued)
July 2016