User manual for poly-phase meter
11
7 Demand
7.1 Calculation method of MD
Support two types of MD calculation methods: sliding window time and block.
MD sliding time can be set between from 1 to 60 minutes, and MD sliding number
can be set between 1~15, and the sliding time and number should not be more than 60
by multiplication.
7.2 MD recorded content
◼ Import active demand
◼ Export active demand
◼ Import reactive demand
◼ Export reactive demand
◼ Reactive demand in QI
◼ Reactive demand in QII
◼ Reactive demand in QIII
◼ Reactive demand in QIV
◼ Import apparent demand
◼ Export apparent demand
◼ Active demand (|QI+QIV|+|QII+QIII|)
◼ Import active MD with time stamp total and per tariff
◼ Export active MD with time stamp total and per tariff
◼ Import reactive MD with time stamp total and per tariff
◼ Export reactive MD with time stamp total and per tariff
◼ Reactive MD with time stamp total and per tariff in QI
◼ Reactive MD with time stamp total and per tariff in QII
◼ Reactive MD with time stamp total and per tariff in QIII
◼ Reactive MD with time stamp total and per tariff in QIV
◼ Import apparent MD with time stamp total and per tariff
◼ Export apparent MD with time stamp total and per tariff
◼ Active MD (|QI+QIV|+|QII+QIII|) with time stamp total and per tariff