Installation BAT867-R
Release
06
08/2018
2 Installation
The devices have been developed for practical application in a harsh
industrial environment.
On delivery, the device is ready for operation.
Perform the following steps to install and configure the device:
Checking the package contents
Installing and grounding the device
Installing the antennas
Connecting the terminal blocks
Operating the device
Connecting data cables
Making basic settings
Configuring the transmit power
2.1 Checking the package contents
Check whether the package includes all items named in the section
“Scope of delivery” on page 44.
Check the individual parts for transport damage.
2.2 Installing and grounding the device
2.2.1 Installing the device onto the DIN rail
Verify that the device maintains the minimum clearing in order to meet the
climatic conditions:
Top and bottom sides of device: 1.97 in (5 cm)
Left and right device side: 0.79 in (2 cm)