7. Test run
178
SMGB0079 rev.0 - 01/2013
Manual 
Defrost
  Manual  Defrost  Operation 
Starts
Press PSW1 for more than 3 se-
conds  during  heating  operation, 
the  defrost  operation  is  started 
after  2  minutes.This  function  is 
not available within 5 minutes af-
ter starting heating operation
  Manual  Defrost  Operation 
Finishes
Defrost operation is automatica-
lly ended and the heating opera-
tion is started.
  Defrost operation is available regar-
dless of frosting condition and total time 
of heating operation.
  Defrost  operation  in  not  performed 
when  the  temperature  of  outdoor  heat 
exchanger  is  higher  than  10°C,  high 
pressure is higher than 3.3 MPa (33kgf/
cm
2
G) or Thermo-OFF.
•  Do  not  repeat  defrost  operation  fre-
quently.
N O T E
IncaseofRAS-(2-2.5)HVNPorRAS-3HVNCoperationisperformedbyDSW301onthePCBoftheoutdoorunit
insteadofDSW1.