EasyManua.ls Logo

Hitachi RAS-3-HVNC - Page 41

Hitachi RAS-3-HVNC
480 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Unit Installation
27
SMGB0079 rev.0 - 01/2013
2
Suspended unit
1 Suspend the unit as shown in the gures.
2 Ensure that wall can withstand the weight of the outdoor unit indicated on the specications plate.
3 It is advisable that each foot support should bear the full weight of the unit (in order take account of applied stress
fatigue when unit is operating).
RAS-3HVNPE RAS-(4-6)H(V)NPE
RAS-(4-6)H(V)NCE RAS-(8-10)HN(P/C)E
RAS-12HN(P/C)
1
2
3
1
2
3
1. Wall support (eld supplied)
2. Anchor bolts (eld supplied)
C A U T I O N
Followtheseinstallationprocedurescarefully
- Theinstallationmustbedonesoastoensurethattheoutdoorunitdoesnotleanvibratemakeanoiseor
fallintheeventofstronggustsofwindorearthquakes.Calculatetheresistancetovibration(causedby
earthquakes)toguaranteethattheinstallationissturdyenoughtopreventfalls.Securetheunitwithcables
(eld-supplied)wheninstallingtheunitinaplacewithoutwallsorwindprotectionandwhereitislikelyto
beexposedtogustsofwind.
- Whenusingthevibration-proofrubbermatsecureitatfourpointsonthefrontandback.

Table of Contents

Related product manuals