EasyManua.ls Logo

Hoffrichter point 2 - Page 102

Hoffrichter point 2
106 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
102 Annex
Guidance and manufacturer’s declaration – electromagnetic immunity
Voltage dips, short
interruptions and
voltage variations
on power supply
input lines acc. to
IEC 61000-4-11
> 95 % dip in U
T
for
0.5 cycle
> 95 % dip in U
T
for
1cycle
30 % dip in U
T
for
25(50 Hz) cycles/
30(60 Hz) cycles
95 % dip in U
T
for
250 (50 Hz) cycles/
300 (60 Hz) cycles
> 95 % dip in U
T
for
0.5 cycle
60 % dip in U
T
for
5 cycles
30 % dip in U
T
for
25 cycles
> 95 % dip in U
T
for
5 s or 6 s
Mains power quality
should be that of a typi-
cal commercial or hos-
pital environment. If the
user of the point 2 venti-
lator requires continued
operation during power
mains interruption, it is
recommended that the
point 2 ventilator is
powered from an unin-
terrupted power supply
(UPS) or a battery.

Other manuals for Hoffrichter point 2

Related product manuals