EasyManua.ls Logo

Honeywell 5701 - 2. ENGINEERING OPERATING ROUTINES

Honeywell 5701
213 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 - 4
MAN0443.P65 Issue 13 Aug 04 5701 Control System
05701-M-5001 A02279
CHAPTER 7 - ENGINEER'S OPERATING
INSTRUCTIONS
2. ENGINEERING OPERATING ROUTINES
Depending upon the which keypad function push-button is operated, the
following engineering operating routines may be carried out:
Channel Reset.
Channel Select.
Channel Inhibit.
Alarm Configuration and Relay Test.
Catalytic Bridge Current Adjustment.
Zero Signal Calibration.
Span Signal Calibration.
1st Span Signal Calibration.
Sensor Signal Monitoring.
Clock/Calendar Adjustment.
Channel select and reset are carried out by the channel card RESET/
SELECT push-button. See Chapter 6, Section 3.
The remaining engineering functions are carried out after a control card
has been selected using the Engineering Card push-button controls.

Table of Contents

Related product manuals