EasyManuals Logo

HP 10500 series User Manual

HP 10500 series
428 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #144 background imageLoading...
Page #144 background image
136
[SwitchD-isis-1] traffic-eng level-2
[SwitchD-isis-1] quit
5. Configure MPLS TE attributes of links:
# Configure maximum link bandwidth and maximum reservable bandwidth on Switch A.
[SwitchA] interface vlan-interface 1
[SwitchA-Vlan-interface1] mpls te max-link-bandwidth 10000
[SwitchA-Vlan-interface1] mpls te max-reservable-bandwidth 5000
[SwitchA-Vlan-interface1] quit
# Configure maximum link bandwidth and maximum reservable bandwidth on Switch B.
[SwitchB] interface vlan-interface 1
[SwitchB-Vlan-interface1] mpls te max-link-bandwidth 10000
[SwitchB-Vlan-interface1] mpls te max-reservable-bandwidth 5000
[SwitchB-Vlan-interface1] quit
[SwitchB] interface vlan-interface 2
[SwitchB-Vlan-interface2] mpls te max-link-bandwidth 10000
[SwitchB-Vlan-interface2] mpls te max-reservable-bandwidth 5000
[SwitchB-Vlan-interface2] quit
# Configure maximum link bandwidth and maximum reservable bandwidth on Switch C.
[SwitchC] interface vlan-interface 3
[SwitchC-Vlan-interface3] mpls te max-link-bandwidth 10000
[SwitchC-Vlan-interface3] mpls te max-reservable-bandwidth 5000
[SwitchC-Vlan-interface3] quit
[SwitchC] interface vlan-interface 2
[SwitchC-Vlan-interface2] mpls te max-link-bandwidth 10000
[SwitchC-Vlan-interface2] mpls te max-reservable-bandwidth 5000
[SwitchC-Vlan-interface2] quit
# Configure maximum link bandwidth and maximum reservable bandwidth on Switch D.
[SwitchD] interface vlan-interface 3
[SwitchD-Vlan-interface3] mpls te max-link-bandwidth 10000
[SwitchD-Vlan-interface3] mpls te max-reservable-bandwidth 5000
[SwitchD-Vlan-interface3] quit
6. Create an MPLS TE tunnel on Switch A.
[SwitchA] interface tunnel 1
[SwitchA-Tunnel1] ip address 7.1.1.1 255.255.255.0
[SwitchA-Tunnel1] tunnel-protocol mpls te
[SwitchA-Tunnel1] destination 4.4.4.9
[SwitchA-Tunnel1] mpls te tunnel-id 10
[SwitchA-Tunnel1] mpls te signal-protocol rsvp-te
[SwitchA-Tunnel1] mpls te bandwidth 2000
[SwitchA-Tunnel1] mpls te commit
[SwitchA-Tunnel1] quit
7. Verify the configuration:
# Execute the display interface tunnel command on Switch A. You can see that the tunnel interface
is up.
[SwitchA] display interface tunnel
Tunnel1 current state: UP
Line protocol current state: UP

Table of Contents

Other manuals for HP 10500 series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HP 10500 series and is the answer not in the manual?

HP 10500 series Specifications

General IconGeneral
BrandHP
Model10500 series
CategorySwitch
LanguageEnglish

Related product manuals