2-6
Installing the Switch
Installation Procedures
2. Verify the Switch Passes Self Test
Before mounting the switch in its network location, you should first verify it
is working properly by plugging it into a power source and verifying it passes
its self test.
1. For the 24-port and 48-port switches, connect the power cord supplied
with the switch to the power connector on the back of the switch, and
then into a properly grounded electrical outlet.
Figure 2-1. Connecting the power cord
Note The 24-port and 48-port do not have a power switch. They are powered on
when the power cord is connected to the switch and to a power source. For
safety, the power outlet should be located near the switch installation.
The switch automatically adjusts to any voltage between 100-127 or 200-240
volts and either 50 or 60 Hz. There are no voltage range settings required.
Connect power cord to the
power connector