EasyManua.ls Logo

HP 2920 - Prepare the Installation Site

HP 2920
110 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-5
Installing the Switch
Installation Procedures
1. Prepare the Installation Site
Cabling Infrastructure - Ensure the cabling infrastructure meets the
necessary network specifications. See “Cabling and Technology Information”
in the appendices for more information.
Installation Location - Before installing the switch, plan its location and
orientation relative to other devices and equipment:
In the front of the switch, leave at least 7.6 cm (3 inches) of space for
the twisted-pair and fiber-optic cabling.
In the back of the switch, leave at least 3.8 cm (1 1/2 inches) of space
for the power cord. If you are stacking the switches, you will need 20
to 23 cm (approximately 8 to 9 inches), depending on the lengths of
the stacking cables being used.
On the sides of the switch, leave at least 7.6 cm (3 inches) for cooling,
except if the switch is installed in an open EIA/TIA rack.
Figure 2-1. Air flow direction of the HP 2920 switches

Table of Contents

Related product manuals