138
connecting grounding cable to switch chassis
(A5800AF-48G model), 11
connecting grounding cable to switch chassis
(A5820AF-24XG model), 11
connecting IRF member switches (one rack), 59
connecting IRF member switches (ToR solution), 60
connecting power cord, 28
connecting PSR150-A, 31
connecting PSR150-D to –48 VDC power source,
31
connecting PSR150-D to –54 VDC output RPS, 32
connecting PSR300-12A, 33
connecting PSR300-12D1 to –48 VDC power
source, 33
connecting PSR300-12D1 to –54 VDC output RPS,
34
connecting PSR750-A, 35
grounding, 17
grounding using AC power cord, 20
grounding with grounding strip, 17
identifying IRF master, 55
identifying physical IRF ports on member switches,
56
installation, 4
installing A5800-24G-SFP power supply, 26
installing A5800-24G-SFP TAA power supply, 26
installing A5800-48G-PoE+ power supply, 26
installing A5800-48G-PoE+ TAA power supply, 26
installing A5800AF-48G power supply, 23
installing A5820AF-24XG power supply, 23
installing A5820X power supply, 26
installing fan tray, 21
installing interface card, 36
installing OAP card, 38
installing OAP card in expansion interface card
slot, 40
installing OAP card in OAP card slot, 39
installing PoE module, 41
installing power supply, 23
planning IRF connections, 55
planning IRF fabric cabling scheme, 57
planning IRF fabric installation site, 54
planning IRF fabric setup, 54
planning IRF fabric size, 54
planning IRF member IDs, 55
planning IRF topology, 55
powering on, 43, 48, 49
rack-mounting A5800AF-48G model, 13
rack-mounting A5820AF-24XG model, 13
rack-mounting the A5800 model, 15
rack-mounting the A5820X model, 15
removing A5800-24G-SFP power supply, 27
removing A5800-24G-SFP TAA power supply, 27
removing A5800-48G-PoE+ power supply, 27
removing A5800-48G-PoE+ TAA power supply, 27
removing A5800AF-48G power supply, 24
removing A5820AF-24XG power supply, 24
removing A5820X power supply, 27
removing fan tray, 21, 22
removing interface card, 36, 38
removing OAP card, 38
removing OAP card from expansion interface card
slot, 41
removing OAP card from OAP card slot, 40
removing PoE module, 41, 42
removing power supply, 23
setting IRF fabric, 53
setting terminal parameters, 44
setting up configuration environment, 43
troubleshooting, 62
troubleshooting Boot ROM password loss, 62
troubleshooting console login password loss, 62