EasyManua.ls Logo

HP HPE ProLiant DL120 Gen9 - Front I;O Module

HP HPE ProLiant DL120 Gen9
119 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Removal and replacement procedures 69
4.
Do one of the following:
o Slide the server into the rack.
o Install the server into the rack.
5. Power up the server.
For more information about battery replacement or proper disposal, contact an authorized reseller or an
authorized service provider.
Front I/O module
To remove the component:
1. If installed, remove the security bezel ("Remove the security bezel (optional)" on page 29).
2. Power down the server (on page 30).
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Do one of the following:
o Extend the server from the rack (on page 30).
o Remove the server from the rack (on page 33).
5. Remove the access panel ("Access panel" on page 40).
6. Remove the front I/O module.
a. Disconnect the front I/O module from the system board.
b. Detach the ambient thermal sensor cable from its clip.
c. Remove the screws and disconnect the front I/O module connectors from the front panel.
Four-bay LFF drive model

Table of Contents

Related product manuals