8. Route the USB and video cables through the opening.
9. If installing the front 2SFF stacked drive cage, install the drive cage .
10. Install the universal media bay.
11. Connect the cables .
12. Install the access panel .
13. Slide the server into the rack.
14. Connect each power cord to the server.
15. Connect each power cord to the power source.
16. Power up the server .