EasyManua.ls Logo

Huawei AR120 Series - Connecting the AC Power Cable

Huawei AR120 Series
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NOTE
Place the dust plug in an appropriate place. After optical fibers are removed from the optical module,
cover the optical module with the dust plug to protect it from dust.
Step 3 Before connecting optical fibers, attach temporary labels on both ends of each optical fiber to
identify them. For details on how to make labels of optical fibers, see 9.5.2 Engineering
Labels for Optical Fibers.
Step 4 Remove the dust caps from the fiber connectors. Connect one end of the optical fiber to the
optical module and the other end to the remote device.
NOTE
Connect the receive and transmit ends of the fiber connector according to the identifiers on receive and
transmit bores of the optical module. Do not connect the two ends reversely.
LINK
ACT
SYS
micro SD
GE1 GE2
GE0
management
ACT
EN
EN
RST
CON/AUX
AR2200 Series
ON
OFF
~100-240V;
50/60Hz;2A
PWR150A
STATUS
Optical fibers
Optical interface of
the remote device
management
Step 5 Arrange the optical fibers to make them parallel and bundle them with fiber binding tape at an
interval of 150 mm to 300 mm.
Step 6 Replace all the temporary labels with formal labels on the optical fibers.
----End
6.11.5 Connecting the AC Power Cable
Context
DANGER
To avoid electric shock, do not connect power cables while the power is on.
Huawei
AR100&AR120&AR150&AR160&AR200&AR1200&AR
1600&AR2200&AR3200&AR3600 series Enterprise
Routers
Hardware Installation and Maintenance Guide
6 Installing the AR1200 Series/AR2204/AR2220E/
AR2220/AR2204E Series Routers
Issue 05 (2018-07-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
92

Table of Contents

Other manuals for Huawei AR120 Series

Related product manuals