7.2.5.2 Installing the Server on the Ball Bearing Rail Kit
Before installing the server, ensure that the ball bearing rail kit is properly
installed. For details, see 7.2.4.3 Installing the Ball Bearing Rail Kit.
Procedure
Step 1 Install the server.
NO TICE
At least two people are required to move the device. Otherwise, personal injury or
device damage may occur.
1. Pull out the inner rails as far as they will go.
Figure 7-9 Pulling out inner rails
2. Lift the server (at least two people are required), align the positioning pins on
the server with the holes on the inner guide rails, and push the server in the
arrow direction until the locking pins engage. See (1) and (2) in Figure 7-10.
FusionServer Pro 1288H V5 Server
User Guide 7 Installation and Conguration
Issue 13 (2020-06-05) Copyright © Huawei Technologies Co., Ltd. 65

Table of Contents

Other manuals for Huawei FusionServer Pro 1288H V5

Related product manuals