Procedure
Step 1 Install oating nuts.
1. Determine the installation positions of the oating nuts according to the
cabinet device installation plan.
Figure 7-3 Spacing of 1U on a mounting bar of a cabinet
– Floating nuts are used to tighten screws.
– The boundary between Us is used as the reference for calculating device
installation space.
2. Fasten the lower end of a oating nut to the target square hole in a
mounting bar at the front of the cabinet.
3. Use a
oating nut hook to pull the upper end of the oating nut, and fasten
it to the upper edge of the square hole.
FusionServer Pro 2288X V5 Server
User Guide 7 Installation and Conguration
Issue 04 (2020-06-05) Copyright © Huawei Technologies Co., Ltd. 73