Figure 7-12 Pushing the server into the ball bearing rail kit
5. Tighten the captive screws on the mounting ears.
Figure 7-13 Securing the server
Step 2 Install a cable management arm (CMA).
1. Insert the bracket on the right of the CMA into the right guide rail. See (1) in
Figure 7-14.
FusionServer Pro 2288X V5 Server
User Guide 7 Installation and Conguration
Issue 04 (2020-06-05) Copyright © Huawei Technologies Co., Ltd. 82