4.7 Installing the Smart PCS on the DCBOX
● A maximum of ve Smart PCSs can be installed on the top of the DC LV Panel (DCBOX).
If less than
ve Smart PCSs will be installed, install them from left to right. Otherwise,
the Smart PCS fasteners cannot be used.
● The installation method of all Smart PCSs is the same. Install the Smart PCS according
to the direction shown in the
gure. This section uses one Smart PCS as an example.
Installation Description
● Use the DCBOX-9/5-H0 DCBOX purchased from the Company.
● For details, see
DCBOX DC LV Panel User Manual
.
Installation Diagram
Figure 4-16 Installation
LUNA2000-200KTL-H0 Smart Power Control System
User Manual 4 Installation