Check Item Check Method Maintenance
Interval
System running
status
● Check that the Smart PCS is not
damaged or deformed.
● Check that the Smart PCS
operates with no abnormal
sounds.
● Check that the parameters are
set correctly.
Once every 6 months
Cable
connections
● Check that cables are secured.
● Check that cables are intact,
and ensure that any parts in
contact with metallic surfaces
are not scratched.
● Check that the idle COM, USB,
and FE ports are protected by
waterproof caps.
The rst inspection
must be performed 6
months after the
initial commissioning.
Subsequent
inspections can be
performed every 6 to
12 months.
Grounding
reliability
Check that ground cables are
securely connected.
The rst inspection
must be performed 6
months after the
initial commissioning.
Subsequent
inspections can be
performed every 6 to
12 months.
Removing the Air Inlet
Bae
Figure 9-1 Removing the bae
After cleaning is complete, reinstall the air inlet bae. Tighten the screws to a
torque of 1.2 N·m.