Figure 4-10 Setting battery control parameters
Parameter Description
Working mode Set this parameter to Charge/Discharge based on grid
dispatch.
Automatic SOC
calibration
If this parameter is set to Disable, automatic charge and
discharge calibration is not allowed for battery racks.
If this parameter is set to Enable, automatic charge and
discharge calibration is allowed for battery racks. The
ESS periodically calibrates the SOC rack by rack. During
the calibration, the end-of-charge SOC and end-of-
discharge SOC settings will be overridden so that the
ESS can be fully charged or discharged.
On-grid scenario: Automatic charge calibration is
allowed for battery racks.
O-grid scenario: Automatic discharge calibration is
allowed for battery racks.
Automatic SOH
calibration
Set this parameter to Disable.
Detection start
time
Set the start time of the PCS insulation resistance
detection.
If a dialog box You are advised to change the insulation
resistance detection time to the optimal time:
XX:XX
is
displayed, you are advised to click Conrm and set
Detection start time to the optimal time. SmartLogger
V300R023C00SPC172 and later versions support this
function.
Step 7 Connect to a Huawei network management system (NMS).
Set related parameters by referring to "Setting Parameters for Connecting to
the Management System" (content related to a Huawei NMS) in the
SmartLogger3000 User Manual
.
Commercial and Industrial Microgrid Energy Storage
Solution
Quick Guide (With Third-Party Microgrid Central
Controller) 4 System Power-On and Commissioning
Issue 04 (2023-12-18) Copyright © Huawei Digital Power Technologies Co., Ltd. 32