Connect one end of the ground cable of each subrack to the bottom-side ground bolt of the subrack and the
other end to an idle ground bolt adjacent to this subrack on the right-side column of the cabinet and use a
screw to secure this end.
Connect the ground cables of the PDU in parts A and B to the ground bolts at both sides of the cabinet.
Installing Ground Cables
a
1
2
4 Installing and Routing Ground and Power Cables to a Subrack
Ground cable
Phillips screwdriver
Ground point for the
DPD63-4-8 PDU