EasyManua.ls Logo

Huawei OptiX OSN 6800 - 7 Installing and Routing Clock Cables

Huawei OptiX OSN 6800
51 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
35
Routing Alarm and Indicator Cables
c
Remove the subrack cover.
Connect alarm and indicator cables
to the subrack interface area.
Route alarm and indicator
cables.
Bundle alarm and indicator cables
(If there is no outside fiber winding
direction, just bundle cables in the
inside one).
Restore the subrack
cover back to the original
position.
7 Installing and Routing Clock Cables
Use the clock cascading cables to connect clock and time interfaces between the master and slave subracks.
Use the clock cascading cables to connect clock interfaces between NEs and use the straight through cables to
connect time interfaces.
For the cables used to connect the OptiX OSN 6800 to other equipment, see Clock/Time Cable in the
Hardware Description.
Diagonal pliers
Cable tie
Phillips screwdriver
NOTE

Table of Contents

Other manuals for Huawei OptiX OSN 6800

Related product manuals