EasyManua.ls Logo

Huawei OptiX OSN 6800 - 1 Installing Subracks (Subracks, Two CRPC Boards and Multiple DCM Frames)

Huawei OptiX OSN 6800
51 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
37
40
60
61
76
81
83
5
35
36
22
21
46
47
62
63
77
3
2
6
7
10
12
14
16
PDU
DCM
DCM
DCM
CRPC
CRPC
5
For safety concern, at least two persons are required to install a subrack. One person is to hold the subrack and
the other person to tighten the panel screws.
Install two CRPC boards and multiple DCM frames to the lower subrack.
1 Installing Subracks (Subracks, Two CRPC Boards and Multiple DCM
Frames)
Installing Subracks and Boards
Structural
component
Installation
holes on one
column
DCM frame
2, 3
4, 5
6, 7
CRPC
10, 12
14, 16
Subrack 1 21, 22, 35, 36
Air deflector 37, 40
Subrack 2 46, 47, 60, 61
Subrack 3 62, 63, 76, 77
TN11PDU 79, 83
DPD63-4-8
PDU
81, 83
OptiX OSN 6800
Subrack 3
OptiX OSN 6800
Subrack 2
OptiX OSN 6800
Subrack 1
Front
NOTE
NOTE
Air deflector

Table of Contents

Other manuals for Huawei OptiX OSN 6800

Related product manuals