30
Bundle the power cables (if there
is no outside fiber winding
direction, just bundle cables in
the inside one).
Do not install or remove power cables while the equipment is powered on. Ensure that the power is switched off prior
to removing or installing a power cable to avoid bodily injuries.
Remove the subrack cover.
Plug the end (with DB3
connector) of the power cable
into the PIU board and tighten
the screw.
Route power cables
connected to the subrack.
Restore the subrack cover
back to the original position.
The power cables have
been installed.
1
1
2
2
3
3
4
4
5
5
6
6
Installing and Routing Power Cables
c
Diagonal pliers
Cable tie
Phillips screwdriver
WARNING