PowerCube 5000
User Manual (SmartLi 100Ah)
Copyright © Huawei Technologies Co., Ltd.
3 Installation
3.1 Installation Preparations
3.1.1 Installation Clearances
Reserve sufficient clearances around the ICC cabinet for operation and ventilation:
At least 1000 mm in the front
At least 500 mm at the rear
Reserve at least 800 mm in front of the lithium battery cabinet for ventilation and operation.
3.1.2 Preparing Cables
Table 3-1 Preparing cables for the ICC cabinet
Minimum
Cross-sectio
nal Area
Maximum
Cross-sectional
Area