Figure 3-41 Installing the parallel EPO control cable
After startup, press the EPO buttons in cabinets 1 and 2. The two cabinets should stop.
----End
3.8 Installation Verification
Table 3-6 Cabinet installation checklist
No.
Check Item
Acceptance criteria
1
Installation and
securing
The cabinets are placed in accordance with the design drawing.
The bases are secured.
2
Arrangement of
combined
cabinets
The adjacent cabinets are neatly arranged and secured with
connecting plates.