EasyManua.ls Logo

Huawei SUN2000-50KTL-JPM0 - Maintenance; 8.1 Routine Maintenance; 8.2 Spot-check Terminal Signals

Huawei SUN2000-50KTL-JPM0
113 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SUN2000-(50KTL-JPM0, 50KTL-JPM1, 63KTL-JPM0)
User Manual
8 Maintenance
Copyright © Huawei Technologies Co., Ltd.
89
8 Maintenance
8.1 Routine Maintenance
To ensure that the SUN2000 can operate properly for a long term, you are advised to perform
routine maintenance on it as described in this chapter.
Before cleaning the system and maintaining the cable connections and grounding
reliability, power off the system (see 6.3 Powering Off the System for details) and ensure
that the two DC switches on the SUN2000 are OFF.
If you need to open the maintenance compartment door on rainy or snowy days, take
protective measures to prevent rain and snow entering the maintenance compartment. If it
is impossible to take protective measures, do not open the maintenance compartment door
on rainy or snowy days.
Table 8-1 Maintenance checklist
Item
Check Method
Maintenance
Frequency
System cleanliness
Periodically check that the heat sinks
are free from obstacles or dust.
Once every six to twelve
months
System running
status
Check that the SUN2000 is not
damaged or deformed.
Check that the running sound of the
SUN2000 is normal.
When the SUN2000 is running,
check that all SUN2000 parameters
are correctly set.
Once every six months

Table of Contents

Related product manuals