Figure 5-26 Connecting the cable
Step 2 Connect the signal cable connector to the COM port.
Figure 5-27 Securing the signal cable connector
----End
5.7.4 (Optional) Connecting the Power Grid Scheduling Signal
Cable
Procedure
Step 1 Connect the signal cable to the signal cable connector.
SUN2000-(50KTL-ZHM3, 50KTL-M3)
User Manual 5 Electrical Connections
Issue 05 (2023-02-28) Copyright © Huawei Technologies Co., Ltd. 55