Figure 8-1 Installing the locking screw for the DC switch
Step 5 Turn on the DC switch between the PV string and the SUN2000 if there is any.
----End
8.2 Routine Maintenance
To ensure that the SUN2000 can operate properly for a long term, you are advised
to perform routine maintenance on it as described in this chapter.
CA UTION
Before cleaning the system, connecting cables, and ensuring the grounding
reliability, power
o the system.
Table 8-1 Maintenance checklist
Check Item
Check Method Maintenance
Interval
System
cleanliness
Check periodically that the heat sinks
are free from obstacles and dust.
Once every 6 to 12
months
System
operating
status
Check that the SUN2000 is not
damaged or deformed.
Check that the SUN2000 operates
with no abnormal sound.
Check that all SUN2000 parameters
are correctly set during operation.
Once every 6
months
Electrical
connection
Check that cables are secured.
Check that cables are intact, and
that in particular, the parts touching
the metallic surface are not
scratched.
The rst inspection is
6 months after the
initial
commissioning.
From then on, the
interval can be 6 to
12 months.
SUN2000-(50KTL-ZHM3, 50KTL-M3)
User Manual 8 Maintenance
Issue 05 (2023-02-28) Copyright © Huawei Technologies Co., Ltd. 71

Table of Contents

Other manuals for Huawei SUN2000-50KTL-ZHM3

Related product manuals