Check Item Check Method Maintenance
Interval
Grounding
reliability
Check that ground cables are securely
connected.
The rst inspection is
6 months after the
initial
commissioning.
From then on, the
interval can be 6 to
12 months.
Air tightness Check that all terminals and ports are
properly sealed.
Once a year
Clear
vegetation
around the
inverters
Perform inspection and weeding as
required.
Clean the site promptly after
weeding.
Based on the local
wilting season
8.3 Troubleshooting
Alarm severities are dened as follows:
Major: The inverter is faulty. As a result, the output power decreases or the
grid-tied power generation is stopped.
Minor: Some components are faulty without
aecting the grid-tied power
generation.
Warning: The inverter works properly. The output power decreases or some
authorization functions fail due to external factors.
SUN2000-(50KTL-ZHM3, 50KTL-M3)
User Manual 8 Maintenance
Issue 05 (2023-02-28) Copyright © Huawei Technologies Co., Ltd. 72

Table of Contents

Other manuals for Huawei SUN2000-50KTL-ZHM3

Related product manuals