Table 8-1 Maintenance list
Check Detail Check Method Maintenance Interval
System cleanliness Check the heat sink for foreign matter or the
overall health of the SUN2000.
Annual or every time an
abnormality is detected
System running
status
Check the SUN2000 for damage or
deformation.
Annual
Electrical
connections
Cables are securely connected.
Cables are intact, in particular, the parts
touching the metallic surface are not
scratched.
The rst inspection is 6
months after the initial
commissioning. From then
on, the interval can be 6
to 12 months.
Grounding
reliability
Check whether the ground terminal and ground
cable are securely connected.
Annual
Sealing Check whether all terminals and ports are
properly sealed.
Annual
8.3 Troubleshooting
NO TE
Contact your dealer or Huawei technical support if the measures listed in the
Troubleshooting Suggestion column have been taken but the fault persists.
Alarm severities are dened as follows:
Major: The inverter is faulty. As a result, the output power decreases or the
grid-tied power generation is stopped.
Minor: Some components are faulty without
aecting the grid-tied power
generation.
Warning: The inverter works properly. The output power decreases or some
authorization functions fail due to external factors.
SUN2000-(8KTL-20KTL)-M2
User Manual 8 Maintenance
Issue 11 (2023-02-07) Copyright © Huawei Technologies Co., Ltd. 94

Table of Contents

Other manuals for Huawei SUN2000-8KTL-M0

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei SUN2000-8KTL-M0 and is the answer not in the manual?

Huawei SUN2000-8KTL-M0 Specifications

General IconGeneral
BrandHuawei
ModelSUN2000-8KTL-M0
CategoryInverter
LanguageEnglish

Related product manuals