EasyManua.ls Logo

Huawei SUN2000-8KTL-M0 - B Setting Dry Contact Scheduling Parameters

Huawei SUN2000-8KTL-M0
97 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SUN2000-(12KTL, 15KTL, 17KTL, 20KTL)-M0
User Manual
B Setting Dry Contact Scheduling Parameters
Copyright © Huawei Technologies Co., Ltd.
80
B Setting Dry Contact Scheduling
Parameters
Scenario 1: Single inverter + Smart Dongle
Prerequisites
You have logged in to the app as installer. The initial password is 00000a. Use the initial
password upon first power-on and change it immediately after login. To ensure account
security, change the password periodically and keep the new password in mind. Not changing
the initial password may cause password disclosure. A password left unchanged for a long
period of time may be stolen or cracked. If a password is lost, devices cannot be accessed. In
these cases, the user is liable for any loss caused to the PV plant.
Procedure
Step 1 Set dry contact scheduling parameters.
Set Dry contact scheduling to , and set Active power control and Reactive power control.

Table of Contents

Other manuals for Huawei SUN2000-8KTL-M0

Related product manuals