Figure 5-22 Connector connection
NO TICE
If the DC input power cables are reversely connected and DC switches are set to
ON, do not immediately turn
o the DC switches or reconnect the positive and
negative connectors. Otherwise, the device may be damaged. The caused
device damage is not covered under any warranty. Wait until the solar
irradiance declines at night and the PV string current reduces to below 0.5 A.
Then, turn
o the three DC switches, remove the positive and negative
connectors, and rectify the connection of the DC input power cables.
Connect the PV string connector to the inverter connector, and then pull back
the PV string connector along the axial direction to check whether the
connectors are securely connected.
The connector must be securely connected. Damages caused by improper
connection are not covered under the warranty.
Figure 5-23 DC input power cabling requirement
SUN2000-(100KTL, 110KTL, 115KTL)-M2
User Manual 5 Electrical Connections
Issue 02 (2022-06-30) Copyright © Huawei Technologies Co., Ltd. 57

Table of Contents

Other manuals for Huawei SUN2000 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei SUN2000 Series and is the answer not in the manual?

Huawei SUN2000 Series Specifications

General IconGeneral
Max Efficiency98.6%
MPPT Efficiency99.9%
Protection RatingIP65
Max. DC Voltage1100 V
Rated AC Frequency50 Hz / 60 Hz
Rated Power3kW - 10kW
Operating Temperature Range-25 °C ~ +60 °C
CommunicationRS485
Rated AC Power3kW - 10kW
Power Factor Adjustment Range0.8 leading to 0.8 lagging
Total Harmonic Distortion (THD)≤ 3%
ProtectionDC reverse polarity
CoolingNatural convection
DC ConnectionMC4