UPS5000-E-(50 kVA-300 kVA)
User Manual (50 kVA Power Modules)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure 3-4 Removing binding tapes
Step 4 Remove packing materials, as shown in Figure 3-5.
Figure 3-5 Removing packing materials
Step 5 Remove the plastic bag and take out the fittings box.
Step 6 Check that the UPS is intact.
1. Visually inspect the UPS appearance for shipping damage. If it is damaged, notify the
carrier immediately.