EasyManua.ls Logo

Hunter DSP9100 - Calibration Results

Hunter DSP9100
17 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
13. With the trolley carriage toward the operator, slide the trolley onto the beam.
TROLLEY
CARRIAGE
14. Reinstall the trolley stop bolt previously removed through the beam and secure with the nut previously
removed.
GROOVED ROLLE
R
TROLLEY BOLT
FLAT ROLLE
R
NOTE: For the trolley stop bolt to work properly, it must be installed from the inside
of the beam and the nut located on the backside of the beam.
15. Roll an average size tire/wheel assembly onto the trolley.
16. Lift the lift control handle “up” to move the lifting beam and trolley into position to slide the tire/wheel assembly
onto the spindle. Verify that the tire/wheel assembly is centered vertically on the spindle.
TIRE/WHEEL
A
SSEMBLY CENTERED
VERTICALLY ON
SPINDLE
SPINDLE
17. Slide the beam forward or backward to center the tire/wheel assembly on the spindle horizontally.
18. When the tire/wheel assembly is centered vertically and horizontally, securely tighten the four bolts attaching
the mounting flange to the attachment blocks.

Other manuals for Hunter DSP9100

Related product manuals