EasyManua.ls Logo

Husqvarna RB150 - Steering Spindle and Gear Sector Service

Husqvarna RB150
104 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
English – 79
E
POWER TRANSMISSION
Checking movement of the upper spring holder
1. Press the forward pedal (7) to the bottom and
measure size Y.
A. Reduce length h
2
of the setting screw (8) if
the size Y <130 mm.
B. Increase length h
2
of the setting screw (8) if
the size Y >130 mm.
2. After adjusting the forward pedal, tighten the
locknut of the setting screw (8), and check the
size Y again.
3. Fit the rear plate. (See below)
h
h
8
9
67
1
2
Y
5
1
2
2
213
Rear plate
Mounting
1. Connect the cables to the microswitch (3), insert
the grass discharge chute and fit the rear plate.
2. Fit the eight screws (2).
3. Fit the six screws (1).
Eng-4 sidan 55-102 97-04-11, 15.4079

Table of Contents

Related product manuals