16
1)
sateachcornerofthe case to levelout anydiscrepanciesinorder to optimize case
eand proper drainage. (See Q3 MV-BC Canopy Arm Adjustment Procedure)
2) Pushcases together untilthe alignmentpin intrudetothe assignedopposite holes.
4) Using3/8"Hardware, boltcasetogetherusing washersfor allfive locations.
For
Leveling
Access holesfor instalingjoining bolts.
Q3 MV-BC JOININGCASETOCASE-STEP 2
JoiningRiv Nuts areinstalled on
theright side of thecasebydefult.
Joiningholes apears on the
rightsideofthe case by defult,
andrequire boltsand washers.
Installation (cont’d)