Figure 67. Reconnecting the signal cable and the power cable
3. Replace the air baffles. For instructions, see Replacing the air baffle (www.ibm.com/support/
knowledgecenter/POWER9/p9haj/p9haj_922_airbafflereplace.htm).
Preparing the 5105-22E, 9008-22L, 9009-22A, 9009-22G, or 9223-22H system for
operation after removing and replacing the drive backplane power cable
To prepare the system for operation after removing and replacing a drive backplane power cable,
complete the steps in this procedure.
Procedure
1. Slide the service access cover (A) onto the system unit.
2. Close the release latch (B) by pushing it in the direction shown.
Drive backplane cables in the 5105-22E, 9008-22L, 9009-22A, 9009-22G, or 9223-22H
73