EasyManua.ls Logo

IBM Selectric - Lower Ball Socket & Tilt Ring Removal; Rotate Tape Replacement

IBM Selectric
183 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LOWER
BALL
SOCKET
AND
TILT
RING
REMOVAL
1.
Remove
the
left
dust
cover
and
ribbon
cartridge.
Center·
the
carrier
over
the
cycle
shaft.
2.
Shift
into
upper
case.
3.
Remove
the
two
screws
(#1,
Figure 12)
that
hold
the
print
contact
plate
to
the
frame.
Remove
the
contact
assembly,
holding
it
to
the
front
with
a
rubber
bond.
4.
Hal f
cycle
a
a-rotate
l-ti
It
character.
Note
which
posi
....
tion
the
ti
It
detent
is
in for
replacement
and
be
sure
the
machine
is
still
in
upper
case.
5.
Loosen
the
two
set
screws
(#1,
Figure
15).
6.
Remove
the
two
pivot
pins
(#2,
Figure
15).
7.
Remove
the
ti
It ring
(#3,
Figure 15)
and
remove
the
ball
joint.
S.
Loosen
the
rotate
pulley
set
screw
(#1" Fig'ure
16).
9.
Use
the
butt
end
of
a small
spring
hook
as a
follower
to
push
out
the
lower
ball
socket
(#2,
Fi~~ure
16).
NOTE:
This
prevents
the
wedge
from
being
lost.
When
replacing
the
socket
be
sure
the
pin is
pointing
t'oward
the
front-
left
and
right-rear
corners.
10.
The
following
adjustments
should
be
checked
after
the
low-
er
ball
socket
and
ti
It
ring
is
replaced.
a.
Ti
It
Detenting
b.
T
ypehead
Hom i ng
c.
T'ilt Ring
d.
Upper
Ball
Socket
Figure
15.
Lower Ball
Socket
and
Ti
It Ring Removal
2
Figure
16.
Lower Ball
Socket
and
Ti
It Ring Removal
ROTATE
TAPE
REPLACEMENT
1.
Remove
the
left
and
right
dust
covers.
2.
Position
the
carrier
3" from
the
left
frame.
3.
Remove
the
broken
pieces
of
tape
from
the
machine.
4.
Pull
the
ti It
ring
toward
the
front
of
the
machine
and
turn
the
rotate
pulley
until
the
T-slot
is
accessible
(#1,
Fig-
ure
17).
5.
Insert
the
rotate
tape,
eyelet
first
(#2,
Figure
17),
be-
tween
the
rotate
pulley
and
the
right
side
of
the
yoke
from
beneath
the
ribbon
mechanism.
6.
Pull
the
tape
through
and
insert
the
T
-tip
of
the
tape
into
the
T-slot
of
the
pulley
(#1,
Figure
lS).
7.
Thread
the
ta-pe
around
the
rotate
-arm
pu
II
ey,
top
to
front,
keeping
it
under
the
carrier-return
cord,
around
the
shift-
arm
pulley,
and
anchor
it
to
the
carrier.
S.
Connect
the
ti
It-pulley
spring
with
the
open
end
to
the
rear
(#2,
Figure
19).
9.
Restore
the
2 pounds
of
rotate-spring
tension.
10.
Check
the
type
head
homing
adjustment.
Figure
17.
Rotate
Tape
Replacement
3-5

Table of Contents

Other manuals for IBM Selectric

Related product manuals