EasyManuals Logo

IBM Selectric Reference Manual

IBM Selectric
183 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #174 background imageLoading...
Page #174 background image
If
the
machine
will fail with
only
the
R2A
armature
attracted
but
wi
II
work with the
T2
and
R-5
arma-
tures I
see
Servi
ce
Hi
nt
14.8.
If
nei
ther
test
wi
II
run 1 hand
cycle
through
the
operation
and follow
the pri nt
area
in
output
mode flow
chart.
25.3
S.
H.
All
ARMATURE
TEST
Purpose:
Check
pri nt
area
for
extra
cyc
les,
caused
by
magnet assembly fai lures.
Function Switch:
Print
Space
Hit
and
Rotate TO R-5
A fai lure
wi
II
appear
as a
T3
R5
character
(usua Ily a
"period")
in
place
of
a
space.
Check
magnet
assem-
bly
adjustments,
particularly
armature
knock-off
and
trip
lever
to
latch lever
bite.
25.4
S.H.
DYNAMIC
HALF
CYCLING
Use
0 lSA ti
It
and
rotate
switches
and
the
Hoover-
ometer
handle
to
dynamically
half-cycle
whi
Ie
check-
ing
detent
and
alignment
adjustments.
On
keyboard-
less
machines,
this
is
a more
dependable
method than
hand
selecting
the
print
magnet
armatures.
25.5
S.
H. CONTACT
FAI
lURES
Contact
fai lures in
the
Selectric
I/O
may
cause
ex-
treme
Iy
difficu
It-to-diagnose
malfunctions in liOn
Line
il
applications
but will not
be
detected
by
OlSA
circuitry.
It
is
of
the
utmost importance
that
contacts
be
cor",:,
rectly
timed,
in proper
adjustment,
clean,
and
bounce
free.
Contact
timing
can
be
checked
with a meter whi
Ie
hand
cyc
ling
the
machine.
Tests
have
shown
that
con-
tacts
timed under hand power show
little
or no
change
when
later
checked
dynamically.
Contact
bridging*
can
also
be
checked
with a meter
but this
can
be
regarded on
Iy
as a pre liminary
check.
*Bridging
--
Operating
point makes
contact
with·
normally open point before
it
breaks
contact
with
normally
closed
point.
When
checking
for
bridging,
it
may
be
necessary
to
remove
contact
wiring
to
eliminate
back
cir-
cuits.
To
check
for
bridging,
connect
meter leads
between
N/O
poi nt
and
N/C
poi nt
of
contact
assemb Iy. S
low-
ly
hand
cyc
Ie
the
machine
and
watch
for a short
indi-
cation
on
the
meter.
Check
N/O
air
gap
and
N/C
contact
rise
if
a bridging
condition
is
indicated.
Contact
bounce
must be
checked
dynamically
with a
scope.
Bounce
is
seen on
the
scope as a "noisy" or
IIbroken
Up"
signal
rather
than
the
clean,
sharp rise
ti
me
and
stab
Ie
up leve I of a norma I
contact
signa I .
See Figure 19.
5·30
Bounce may
be
caused
by
insufficient
tension on
the
contact
support
straps,
or
by loose
pile
up screws in
the
contact
assemb
Iy
.
Di
rty
contact
poi nts
wi
II
a
Iso
cause
much
the
same
indication
on
the
scope
as
bounce.
Contacts
should
be
cleaned
with
IB.M
cleaning
fluid
and
clean,
lint-
free
paper.
Never
use
an
abrasive
cleaning
tool on
Selectric
contacts.
Contact
bridging may show up under dynamic
condi-
tions
and
appears
as noise just
after
make time
and
just
before
break
time.
26.0
SAFETY
Sound
safety
regulations
require
that
all
electronic
equipment
must
be
provided with a chassis ground
and
that
this chassis ground must
be
returned
to
earth
ground through
the
third (green) wire
of
the
AC
line
cord.
IBM
safety
regulations forbid
any
deviation
from
the
above
and,
therefore,
the
practice
of
IIfloatingll
the
scope
must not
be
employed.
o
lSA'
s
power supply
_has
been
designed so
that
its
reference
point
(or chassis ground)
can
be-determined
by
the
needs
of
the
user.
This
eliminates
any
need
to
IIfloat
II
a
scope.
27.0
SCOPING
PROCEDURES
WITH
OlSA
Magnet
Pick Time
Condition
1
--
Print
Select
Magnets
Internally
wired in
OlSA
are
47 Q resistors in series
with
the
print
select
magnets.
It is
the
voltage
grop
across
these
resistors
that
wi
II
show
print
magnet
char-
acteristics
on
the
scope:
With machines using +
polarity,
put
the
scope
probe in
the
magnet common
jack
and
the
ground
lead
in
the
print
magnet
test
jack
(Tl,
R-5,
CK,
etc.)
With machines using -
polarity,
put
the
scope
probe
in
the
print
magnet
test
jack
and
the
ground lead in
the
magnet common
jack.
The scope
wave
form
then
wi
II
a Iways
appear
as a
signal starting
at
ground
and
rising
to
a
positive
level.
Condition 2
--
All
Other
Selectric
I/O
Magnets
To
scope
any
other
magnet,
it
is
required
that
a 47
ohm resistor
be
temporari
Iy
wired in series with
the
magnet
pi
ck
coi I.
NOTE:
A tool
wi
II
be
made
available
shortly
to
provide this
feature.
This
device
can
be
kept with
the
OlSA.
To
use,
re-
move
the
magnet
pick
coi I
wire
from its
edge
connec-
tor
in
the
Selectric.
Clip
this wire
to
the
alligator
clip
attached
to
the
resistor. Insert
the
pin
connector
on
the
other
side
of
the
resistor
into
the
edge
connec-
tor
on
the
Selectric.
Scope across
the
two pins on
the
epoxy
block.

Table of Contents

Other manuals for IBM Selectric

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM Selectric and is the answer not in the manual?

IBM Selectric Specifications

General IconGeneral
TypeElectric typewriter
Introduced1961
Keyboard LayoutQWERTY
Carriage ReturnElectric
ManufacturerIBM
Printing TechnologyTypeball (golf ball)
Power SourceAC Power
Power Supply120V AC

Related product manuals