EasyManua.ls Logo

IBM Selectric - Carrier Shoe Removal; Operational Interposer Bracket Removal; Operational Shaft Removal

IBM Selectric
183 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATIONAL SHAFT REMOVAL
1.
Complete
the
Shift-(am
Removal.
2.
Remove
the
two
I ugs
and
two
screws from
the
bearing
mounting
plate
(#1,
Figure 50)
and
slide
the
plate
off.
3.
Disconnect
escapement
I
ink.
4.
Work
the
operational
shaft
to
the
right
until
it
clears
the
cycle
clutch
pulley
hub,
then
lift
shaft
out
the
top.
5.
The
following
adjustments
should
be
checked
after
the
operational
shaft
is
replaced.
a.
All
Shift
Mechanism
Adjustments
b.
Shift
Magnet
Assembly
c.
Upper
Case
TYP,ehead Homing
d.
Gear
Mesh
*
Screw
is
hidden
behind
SHIFT
ARM
Figure
50.
Operational
Shaft
Removal
OPERATIONAL INTERPOSER
BRACKET
REMOVAL
1.
Complete
the
Shift-(am
Removal.
2.
Complete
the
Operational-Magnet
Removal.
3.
Complete
the
Operational-Shaft
Removal.
4.
Complete
the
Operational-Latch-Bracket
Removal.
5.
Remove
the
six
(two
shown)
mounting
screws
(#1,
Figure
51).
6.
Remove
the
C5
Auxiliary
Cam
Follower.
7.
Remove
the
key-lever
pawl
guides
from
the
operational-
interposer
bracket
(not
shown).
8.
Work
bracket
assembly
out
through
rear
of
machine.
9.
The
following
ad
justments
should
be
checked
after
the
operationa
I-interposer-bracket
assembly
is
replaced.
a.
All
Shift
Mechanism
Adjustm'ents
b.
Shift
Magnet
Assembly
c.
Upper
Case
Typehead
Homing
d.
Gear
Mesh
e.
f.
g.
h.
i.
j.
k.
Operational
Latch
Pivot
Pin
Eccentric
Escapement
Trigger
Guide
Mainspring
Tension
Keylever
Pawl
to
Interposer
C I€!arance
Operational
Latch
Height
Backspace
Rack
Pawl
Clearance
I.
m.
n.
Clutch
Latch
Overthrow
Carrier
Return
Actuating
Arm
Multiplying
Control
Lever
Figure
51.
Operational
Interposer
Bracket
Removal
CARRIER SHOE REMOVAL
1.
Remove
the
two
card-holder
screws
(#1,
Figure
52).
2.
Remove
the
two
escapement-bracket
screws
(#2,
Figure
52) .
3.
Work
the
carrier
out
from
under
the
escapement
bracket
to
the
ri
ght
4.
5.
3-15
Figure
52.
Carrier
Shoe
Removal
Remove
the
nut
from
the
carrier-shoe
stud
and
remove
the
shoe
(#1,
Figure
53).
The
following
adjustments
should
be
checked
after
tht,
carrier-shoe
is
replaced.
a.
Carrier
Shoe
b.
Escapement
Bracket

Table of Contents

Other manuals for IBM Selectric

Related product manuals