The Customer Engineer will
usually
make
his
adjust-
ment,
tighten
the
lock
nut,
and
find his
adjustment
has
changed
severa
I days
later.
This is
due
to
the
I
limited
engagement
of
the
nut on
the
clevis.
When~
ever
you
are
making this
adjustment,
check
the
clevis
to
be
sure
there
is
no burr on
the
bottom
and
if
there,
is,
remove
the
clevis
and
file
the
burr
away.
This burr
cannot
be
removed
due
to
manufacturing
tolerances.
A new design
is
anticipated
very
shortly.
Burr
Figure
8.3
8.4
9.0
9.1
9.2
9.3
S.H.
THREADING
OF
ARMATURE
BY
INTERPOSER
LINKS
Repeat
cyc
les or fai lure
to
re lease
an
interposer
may
be
caused
by
the
threaded
portion
of
the
link
biting
into
the
armature,
,causing
an
improper'link
adjust-
ment.
OPERATIONAL
AREA
Operati
ona
I
Notes
REPEAT
FUNCTIONS
There
are
no
repeat
functions on
the
I/O
Printer,
consequently
the
Operational
Keylever
Pawls
require
on
Iy
the
bottom
lug.
The
top
lug (Repeat
Lug)
shou
Id
be
broken
off.
NYLON
CORD
DRUM
If
the
slot
in
the
Nylon
Cord Drum opens or breaks" a
new slot may
be
made
with
a spring hook
which
has
been
heated.
INTERPOSER HEIGHT
The
operational
interposer
height
may
be
adjusted
by
using
the
following
procedure:
a.
Hold
the
Clutch
Release
Arm
so
that
the
cam
re-
peats.
b.
Turn
the
Interposer
adjusting
screw
clockwise,
unti I
the
mechanism begins
to
operate
(carrier
begins
to
move).
9.4
9.5
5·13
c.
Back
the
adjusting
screw
out unti I
the
mechanism
stops
operoti
ng,
then
bac
kit
out
an
addi
ti
ona
I
1/2
turn.
S .
H.
EXCESSIVE
UP
AND
DOWN
PLAY
AT
THE
lH
END
OF
THE
OPERATIONAL
SHAFT
Excessive up
and
down
play
at
the
LH
end
of
the
op-
erationa
I
shaft
requires
the
replacement
·of
the
black
nylon
sleeve
in
the
torque
limiter
hub
and
the
cycle
clutch
pu
lIey
hub.
S.H.
OPERA110NAl
SHAFT REMOVAL
1.
Remove shift
clutch
ratchet
and
clutch
spring.
Do not disturb
the
clutch
arbor.
2.
Loosen
set
screws in: Torque limiter
hub,
tab
governor
hub,
tab
governor
co
liar,
operati
ona
I
cam
ratchet
(and R.
H.
shaft
collar
if
long
car-
riage)
.
3.
Remove
clip
from
C.R.
pinion
spring.
4.
Push
torque
limiter
hub
to
the
left as
far
as
poss-
ible;
then
spread
the
coils
on
the
CR
pinion
spring
and,
with
the
pusher
end
of
a
springhook,
push
the
left hand pi
ni
on
retai
ner
off
the
shaft
.
5.
Move
the
pinion
gear
to
the
left
and
remove
the
retainer
clip
at
the
right
side.
6.
The
operati
ona
I
shaft
may now
be
pu lied out
through
the
shaft
bearing
toward
the
right.
Any
part
mounted on
the
shaft
or
around
it
may
be
easi
Iy
removed
or
rep
laced.
Since
the
shift
clutch
arbor
has not
been
loosened
from
the
shaft,
upon rei nsta lIati on
the
shaft
ne~d
on ly
be
pushed inward unti I
the
shift
clutch
arbor
bears
against
the
shift
bearing
(.002"
- .004
11
end
play)
to
insure
placing
the
carrier
return
pinion
gear
back
into
the
same position
as
before
disassembly.
None
of
the
shift mechanism has
been
removed;
therefore,
no shift
adjustments
need
be
remade or
checked.
In
order
to
reset
the
operational
cams in
their
original
position use
the
"tracks
II
on
the
cam
follower
rollers
as a
guide.
With
ratchets
which
have
only
the
set
screw,
be
certain
the
screw
is
tightened
to
the
flat
side
on
the
operational
shaft.
Reset
the
tab
governor
hub
and
collar,
observing
the
proper
mesh
and
end
play
adj
ustments .
After
re-installation
of
the
C-clip
retainers
on
either
side
of
the
carrier
return
pinion
gear,
move
the
tor-
que
limiter
hub
to
the
right as far as
possible.
Then
spread
the
torque
limiter spring loops
and
insert a
.005
11
feeler
gage
blade
between
the
torque
limiter
hub
and
the
torque
limiter
arbor.
Tighten
the
torque
limiter
hub,
then
remove
the
gage.
Insta
\I
the
c lip which fastens
the
CR
pinion spring
to
the
torque
limiter
arbor.